SBW Construction Site Manager (FTC) - Sutherland and Matjiesfontein

TotalEnergies
TotalEnergies

People & HR, Operations

Posted on Nov 24, 2026

Context & Environment

The Gas, Renewables & Power (GRP) division of TotalEnergies aims to become an integrated electricity provider. Toachieve this goal, GRP is developing a portfolio of renewable and flexible assets to provide low-carbon electricity around

the clock.

The Renewables (REN) business unit within GRP is responsible for the development of renewable assets, such as solar farms and wind turbines.

REN has activities in around 60 countries and 1,100 projects worldwide with a generating capacity of over 30 GW.

About TotalEnergies Renewables Southern Africa (TERSA) :

- TERSA operates in a strong growth and highly competitive environment.

- TERSA maintains a high growth rate relying on tight schedule complex transactions with high financial, legal and

execution stakes.

Activities

The main purpose of this position is to coordinate activities and interact with the SBW Contractor to monitor project Execution, HSE, Quality, Budget and KPI’s. The position is primarily responsible for the performance of the Employer’s staff on Site and timely delivery of a fully constructed, commissioned and tested Self Build Works (SBW) by:

  • Having detailed knowledge of the Power Purchase Agreement, Self Build Agreements, Contract and various Project Agreements/permits/consents (including amongst others environmental authorisations, Employer and Contractor) and managing the stakeholders effectively in line with the Contract.
  • Have detailed knowledge of NTCSA substation standards, take over documentation, permit to work system, system, ORHVS Regs and Outage applications
  • Organizing the site team in order to supervise the EPC Contractors’ construction progress and quality of the works (MTS construction, Overhead Lines and other ancillary works included in the Scope of Works), including commissioning until Take Over (i.e. inspection witnessing, clearing punch list items, issuing mechanical completion certificates, Take Over packages readiness, checking and implementing commissioning procedures, including commissioning and testing).
  • Co-operating with the WEF Construction Site Manager in managing the interfaces between the wind turbine supplier, Balance of Plant contractors, grid connection contractors and other contractors across all sites
  • Co-ordinating day-to-day planning of construction activities to ensure integration, interface management, communication and coordination of the SBW Contractor to prevent delays.
  • Ensuring the SBW Contractor’s compliance in executing the works with all the HSE requirements including:
    • Company HSE Requirements,
    • NTCSA HSE Requirements,
    • Eskom Dx HSE Requirements
    • OHS Act and Construction Regulations, and
    • All other applicable industry best practices.
  • Placing the highest importance and priority on HSE matters to:
    • safeguard the health of the people that may be affected by the performance of the Work and Services,
    • ensure high safety levels in performing the Work and Services,
    • avoid or mitigate negative impacts on the environment and
    • protect the COMPANY’s property, equipment and personnel at the Site.
  • Promoting the site HSE culture and leads Safety Walk downs with the Contractor.
  • Ensuring the SBW Contractor’s compliance in executing the works in accordance with the Employer’s Requirements including:
    • Technical Requirements,
    • Project Management Requirements, and
    • Quality Management Requirements.
  • Assisting the Project Manager with Interface Management between the EPC Contractors according to the:
    • Interface Agreement,
    • Responsibility Matrix, and
    • Communication Matrix.
  • Managing the interface to NTCSA and Eskom (Dx) for grid connection, energisation and grid code compliance testing.
  • Handing Over of the SBW to the NTCSA and Eskom (Dx) where applicable.
  • Organization of the temporary site facilities at each site, including laydown areas, offices, storage areas, etc.
  • Overseeing the provision of site services provided by the Contractor.
  • Leading the weekly site meetings, progress and/or discipline technical meetings with the SBW Contractor, as well as cross-site coordination meetings.
  • Assisting the Project Manager with the inputs for and review of:
    • Weekly and monthly progress reports for each Contractor,
    • SBW Contractor’s payment certificates,
    • SBW Contractor’s project schedule updates, progress monitoring, Recovery schedules, etc..
    • SBW Contractor’s Plans.
  • Verification of the site logbooks (including Daily Diaries) managed by the SBW Contractor.
  • Daily management of on-site Employer’s personnel and vehicles (attendance, leave, discipline, logbooks, etc.) in cooperation with the HR manager.
  • In cooperation with the Project Planning and Control Engineer,
    • a) Monitors and checks the SBW Contractor’s work across each discipline and site to ensure the timely delivery of the works
    • Follow up of the actual progress versus planned values per site and per contractor,
    • Proactively address critical interface delays between contractors and sites (e.g. energization),
    • Ensure that the critical activities are executed according to schedule, and look for opportunities to create margin within the critical path,
    • Analyse the works and recommend optimizations to the Contractor where possible (e.g. crane utilisation and erection sequencing across sites),
    • Evaluate and approve all recovery plans for delayed activities to secure the overall schedule.

Candidate Profile

  • A bachelor’s degree (or equivalent) in any discipline of Engineering
  • Minimum of 7 years’ experience in construction of power plants (technology based), preferably transmission infrastructure, substations, overhead lines, etc. and testing and commissioning on the NTCSA grid.
  • Project Management Professional (PMP) or equivalent certification is preferred
  • Grid infrastructure construction background and experience is a firm requirement
  • Knowledge and experience of NTCSA Main transmission system and substation construction
  • Project size experience to match the size of project at hand
  • A minimum of completion of the construction of three NTCSA MTS projects
  • Knowledge in commissioning, grid code testing and compliance
  • Be knowledgeable in international standards and “best practice” in relation to construction
  • Familiar with the OHSACT, Construction regulations and Eskom ORHVS Regs
  • Be knowledgeable on environmental legislation and good industry practice in relation to construction works
  • IT proficiency MS Word, MS Excel or similar
  • Be prepared to be site based during the construction period
  • Driver’s license